Gas-fired power plant and data center campus at dusk
Türkiye · Europe · Behind-the-meter power

Power first. Gigawatts ready for AI.

A secured European gas-to-power position with a live grid tie — built for hyperscalers, neoclouds and infrastructure investors who need energized capacity, not a place in the queue.

15GWBehind-the-meter generation capacity
30GWScalability pathway on the same fuel position
1GW+Immediate allocation across four existing plants
2062+30Pipeline license term with 30-year extension option
The platform

From molecule to megawatt to model.

We control the fuel, the generation and the interconnect. That means firm, on-site power for AI campuses on timelines the grid can't match — with existing plants providing an immediate bridge while dedicated generation scales.

01

Gas supply

Access to a major Türkiye/Europe pipeline corridor (~25 bcm/yr throughput).

02

On-site generation

15 GW behind-the-meter, with a pathway to 30 GW as demand is contracted.

03

Live grid tie

Inter-grid connection through existing plants for redundancy and export.

04

AI campus

Energized, powered land ready for high-density GPU deployments.

Gas pipelines and turbine machinery lit by amber light

Fuel, generation and interconnect — one secured position.

Deal structures

Flexible ways to partner.

We work with hyperscalers, AI-native operators, infrastructure funds and strategic investors. Structures are tailored to capacity, tenor and risk appetite.

Capacity lease

Contracted power & powered shell

Long-term allocation of firm megawatts for your AI campus.

  • Start from 1 GW+ available now
  • Scale in phases toward 15 GW
  • Long-dated offtake
Joint venture

Co-develop generation + compute

Shared ownership of power assets and data center build-out.

  • Equity alongside the fuel position
  • Aligned upside on expansion to 30 GW
  • Local development and permitting
Capital partnership

Finance the build-out

Project finance, structured credit or equity against contracted power.

  • Infrastructure-grade asset base
  • License through 2062 + 30 yrs
  • Multiple plant sites
Power lines and gas pipeline crossing dark terrain toward glowing data centers
Why this position

The bottleneck is power. We start there.

AI demand is outrunning grid connections across Europe and the US. A site with its own fuel, its own generation and an existing interconnect removes the constraint that stalls most projects.

01

Speed to power

Existing plants provide immediate allocation while new capacity is built.

02

Fuel security

Direct pipeline access with a long-dated license and extension option.

03

Scale headroom

A single platform that can grow from 1 GW to 15 GW and beyond.

04

Strategic geography

Positioned between Europe, the Middle East and Central Asia.

Get in touch

Let's talk about your next gigawatt.

Share a little about your requirements and we'll follow up with site information and next steps. Based in Los Angeles, operating across Türkiye and Europe.

Opens your email client with the details pre-filled.